Big Lift on a Rainy Day
JJ Curran Crane was on site this morning at the new City of Detroit Water Facility, part of the Oakwood CSO Project. Working for Barton Malow, our 300 Ton Grove crane lifted the 53 foot vertical pump weighing 68,000 lbs. It is the 6th pump of 8 that will be lifted at a radius of 65 feet with 150 ft. of boom. Please visit our Gallery to see photos.