500 Ton Krupp Places 77,000 Lb. Bridge Beams
The 500 Ton Krupp was used to place thirteen 93 ft long, 77,000 lb. precast concrete beams using 115 ft. of luffing jib with a radius of 100 ft. The beams will support a new road spanning the Flint River in Flint Michigan. Related article at https://www.acppubs.com/article/CA6473406.html